ORANGEWOOD DEVELOPMENT
Orange Village Council is considering the possibility of extending the trail through the Orangewood Development. The majority of the recreational trail construction will be funded with the balance of the Pinecrest assessment and the remaining portion from Orange Village’s infrastructure fund.
The trail will be 5’ wide and will be located on the south and east side of Orangewood Drive. The trail will be located in the public right of way adjacent to 35 homes. The Orange Village Engineer has prepared preliminary drawings of the trail which you can accessed by clicking here.